PRODUCTION FACILITIES

NATA Holding brings together many dynamisms from traditional techniques to innovations brought by modern technology in these facilities, where concrete pipes, prefabricated and asphalt production are made by always increasing the durability and accessibility in the production facilities with its strength from its past.

Pipe Factory

Project Features

In accordance with TS 821 EN 1916 and TS 13473 standards, as well as ASTM-C76 and DIN norms, with diameters ranging from 150 mm to 3.000 mm, with socket / tongue-and-groove, integrated gasket, PVC coated concrete - reinforced concrete pipe and inspection chimney base and additional parts are produced.

Area established on 80.000 m2.

160.000 m3/year capacity.



NATA


Location
ANKARA


Date
1967

Kazan Prefabricated Factory

Project Features

In accordance with TS 821 EN 1916 and TS 13473 standards, as well as ASTM-C76 and DIN norms, with diameters ranging from 150 mm to 3.000 mm, with socket / tongue-and-groove, integrated gasket, PVC coated concrete-reinforced concrete pipes and inspection chimneys and fittings. production of prefabricated bridge beams and prefabricated industrial buildings.

Area established on 80.000 m2.

200.000 m3/year capacity.


Çoğanlı Prefabricated Factory

Project Features

In accordance with Turkmenistan and Russian standards, as well as ASTM-C76 and DIN norms, concrete-reinforced concrete pipes, inspection chamber and additional parts, bridge beam, bridge piles, railway sleepers, box culverts, cable channels, power transmission line poles, concrete curbs production is carried out.

Established on an area of 250,000 m2.

300.000 m3/year capacity.


Bereket Prefabricated Factory

Project Features

In accordance with ASTM-C67 and DIN norms, especially Turkmenistan and Russian standards, concrete-reinforced concrete pipes, inspection chamber and fittings, bridge beams, bridge piles, railway sleepers, box culverts, cable channels, power transmission line poles, concrete curbs production is carried out.

Area established on 60.000 m2.

200.000 m3/year capacity.


Abadan Asphalt Factory

Project Features

MARINI TOP Tower 300 Brand.

Established on an area of 15,000 m2.

792.000 tons/year. (based on normal working hours)


Göktepe Crusher

Project Features

It is built on an area of 30,130 m2.

1.650.000 tons/year. (based on normal working hours)


Machine Park

Project Features

600 units.



NATA


Location
-